Hi Bought my still from a HBS Shop about 8 months ago ,30litre boiler with reflux tower
The instructions given to me from my HBS was to run unit when you start getting down to 35% abv turn the unit off mix all you have collected together dilute it down to 40% run it thru
the charcoal filter twice and that’s it .. all i can get out of this unit is 78% then it drops down from there . was also told that i didn't need to pack the Colum .
Since i found this forum i am now confused as to what i should be doing some advice would be appreciated
My aim is to make a good quality spirit
should i pack the Colum / how do i get more abv out of this unit , would this tower be called a cooling management unit