Blondy wrote:Why don't you get the 0.1-2 and the 1-7, then run them in series. You'd get the best of both worlds.
For my still (running 2.4kW), I recon I'll be sitting between 0.5 and 1Lpm for the majority of the time. My problem when I ordered was that I had no idea how fast the flow was (hence the need for the thing). I'd say if you've got 2.4kW you should be fine with the 0.1-2Lpm.
I have 6kW in my boiler, but will run about 3.6kW by the sounds of it, so maybe need a little more.
I figured you'd only be exceeding 2Lp/m when in full reflux, which you're not overly worried about the flow rate...just pump it with water.
My concern is that with a setup like mine where the RC is fed from the PC, the temperature will slowly rise over the run...which alters the run much like a constant temp with a varying flow rate, and that this may be more of an issue than worrying about a measurable flow rate...then again, if you are after replication, if you stick with the flow rate, the temp will probably rise about the same rate as previous runs... :think:
edit: I like your idea Blondy of the two in series, which is what I was thinking...might have to do 2 rotameters and a temp guage all in line on the output water line 8-}