Planning a build

This area is to be used for submitting plans, referencing and conversations related to building stills and accessories.

Re: Planning a build

Postby CyBaThUg » Tue Jan 13, 2015 7:58 pm

K cheers no I meant two seperate 15 amp points but if it's enough on a ten and one on 15 should b sweet
CyBaThUg
 
Posts: 493
Joined: Thu Sep 27, 2012 7:54 pm
Location: townsville
equipment: pot still

Re: Planning a build

Postby MacStill » Tue Jan 13, 2015 8:01 pm

CyBaThUg wrote:K cheers no I meant two seperate 15 amp points but if it's enough on a ten and one on 15 should b sweet


Yeah 6kw is plenty enough for anything your going to run on a 100 litre boiler, I'd go as far as saying it's perfect! :handgestures-thumbupleft:
MacStill
Lifetime Member
 
Posts: 16835
Joined: Fri Mar 18, 2011 1:40 pm
Location: Wide Bay QLD
equipment: Anything I choose :P

Re: Planning a build

Postby phonetic » Sun Feb 08, 2015 10:06 am

Reece Plumbing are ripoffs. $26 for 2 50mm copper pipe ends, cheap option is use 2 inch brass welch plugs & copper electroplate, 500 grams copper sulfate bag costs $5, welch plugs $3 each.
Will copper electroplate brass fittings to test concept.
phonetic
 
Posts: 27
Joined: Fri Oct 31, 2014 8:38 am
equipment: DIY reflux still 900 mm column height, 15 litre wash, 2400w electric heating element, digital temp control.

Previous

Return to Hardware Research & Development



Who is online

Users browsing this forum: No registered users and 17 guests

cron

x