image1.JPG
Hey
Even though I have not TIG welded for years (and than some) I made a SS boiler out of two SS cylinders but for some reason the factory welding on them was not SS. So before they rust etc Im joining almost two kegs together to get about the 80lt so I can have no worries of fitting a 60-65 Lt rum wash in and have room for puking.
Last time I welded all fittings etc before joining the two cylinders and other things I was more worried about the two going together for the best fit. This time different elements set up side by side not at 90 to each other, and at the back out of the way. 4" mount, 4" fill pot and a 2" sight glass so I don't have to remove it all the time to fill etc.
Any other pointers anyone can see or I should do yes I can upgrade a port to 6in later if a broom doesn't clean it good enough but thats extra height, as I have a 1"ss ball valve drain at the bottom it will be tall.
You do not have the required permissions to view the files attached to this post.