I've been waiting for a weekend that i could upgrade my current boiler with fill and drain ports but I got sick of waiting so just thought I would get a new boiler made with a few improvements. :happy-partydance: :happy-partydance:
I'm getting both both elements as low as possible parallel to each other, 4" fill port and 2" drain, and i'm getting legs about 400mm high so I can put a 5L jug under and carry waste, 400mm, im thinking 400mm is a bit high but being at my parents ATM while my house is built i have to jug the waste out.