Forced to build new Controller

A section for all electrical discussions, including controllers, elements, wiring diagrams & schematics.
Forum rules
By participating in this section you acknowledge you are aware of aussiedistiller,com.au forum rules, policies & disclaimer.
If you are not aware please go to the rules section "before" you continue in this area of our forums.

"you expressly agree to hold aussiedistiller.com.au, Administration and moderator team, harmless for any property damage, personal injury and/or death, or any other loss or damage that may result from your use of the information or service provided here in and through out our forums"

the information found in our forums, are from many sources, qualified and un qualified as is the nature of the internet, and as such you use this information at your own risk. No liability directly or indirectly will be accepted by aussiedistillers.com.au, administration, the mod team or their heirs, whatsoever.

Regards,

aussiedistiller team.

Forced to build new Controller

Postby Shiftynev » Sat Dec 12, 2015 7:19 pm

My Sparky mate dropped in the other day for a drink (sample some limoncello and CFW i've had on American Oak for a few months). Got to talking and mentioned that I was thinking of upgrading my controller by adding a power meter, fan, etc. A couple of days later came home to find this on my front veranda. Its all SS and has some earthing post already welded on the inside of the case. Dimensions are 400 x 300 x 150mm so there's lots of room to add further bling down the track.Just need to cut out holes for the components.
Controller Housing.jpg
At the moment I intend using an SCR as I have previously used one, but will upgrade to the 10000w model (some of which already have a fan mounted on the heatsink). I'll be running a single 2400w FSD element, so I know what I'm proposing is overkill, but I like to reduce risk (overheating etc) where I can. I'll wire it up using Rumididlydum's wiring diagram below, which he kindly provided for WTDists controller thread. Doesn't look too difficult and an old fart like me should be able to follow the coloured lines and connect some wires. At the end of the day, it's not brain surgery (no offence to any sparky). Once thing I would like to ask is the relative performance of SCR to SSR and what others preferences are and why. Any thoughts would be appreciated.
Rums wiring diagram.png

Once completed I'll get my mate to check and test my handywork.

Cheers
You do not have the required permissions to view the files attached to this post.
Shiftynev
 
Posts: 101
Joined: Mon Aug 04, 2014 7:58 pm
Location: Melbourne
equipment: 5 plate, 4" glass bubbler, 600mm packed section, 2"Pot, 2" Boka, 50ltr Keg boiler 2x2400w elements with voltage controller

Re: Forced to build new Controller

Postby rumdidlydum » Sat Dec 12, 2015 7:33 pm

I won't take credit for that its punchy21 diagram modified :handgestures-thumbupleft:
Look forward to your controller build. :D
rumdidlydum
 
Posts: 2619
Joined: Sun Oct 27, 2013 7:20 pm
Location: CQ
equipment: The infamous Illuminated chicken leg boiler, Rum glass and other bits and bobs

Re: Forced to build new Controller

Postby Shiftynev » Sat Dec 12, 2015 7:39 pm

Thanks to Punchy21 and to everyone else whose contributions make this the fantastic distilling site resource that it.
Shiftynev
 
Posts: 101
Joined: Mon Aug 04, 2014 7:58 pm
Location: Melbourne
equipment: 5 plate, 4" glass bubbler, 600mm packed section, 2"Pot, 2" Boka, 50ltr Keg boiler 2x2400w elements with voltage controller

Re: Forced to build new Controller

Postby WTDist » Tue Dec 15, 2015 11:34 am

If you buy the same controller as me your diagram may be wrong. mine ended up being both the left screws are INPUT and both the right are OUTPUT

Like here
Image

tested mine last night and the following below was all correct and powered a number of high power house appliances at my mates place who is a control systems engineer. Only thing i changed was my earth wire setups. I needed to have a earth wire on all of the bolts for my fan and use a star washer for the earth on the SCR which i used on all the earth points. some grip and vibration thing

This is the wiring. left cable gland goes to the boiler, right to the wall. the switch has an earth wire in this pic going to the SCR but it IS the LOAD and i am yet to change this to red. the pic is old too, the volt meter is fixed too :-D
Image

hope this helps. get it checked still. im still cautious and i know it works. mine will have its firs run tonight with 5L of feints watered down to 40%. then a 2" bubbler CFW wash test begins :dance:
WTDist
 
Posts: 2
Joined: Sun Oct 05, 2014 11:32 am
Location: Brisbane
equipment: Building a 4" bubbler with 8" glass thumper

Re: Forced to build new Controller

Postby Shiftynev » Tue Dec 15, 2015 1:25 pm

Thanks WD,
That's the same one as I currently use. The diagram shows that power both live and neutral (I.e.from the power point) as going into the 2 terminals on the left of the controller and the lead to the element as going out from the 2 terminals on the left of the controller. If you placed the controller in the diagram flat on a table with the terminals facing you, it would be positioned the same as the one depicted in your response. So power in from the left and power out to the elements from the right.

Am I missing something or not reading the diagram correctly.

Cheers
Shiftynev
 
Posts: 101
Joined: Mon Aug 04, 2014 7:58 pm
Location: Melbourne
equipment: 5 plate, 4" glass bubbler, 600mm packed section, 2"Pot, 2" Boka, 50ltr Keg boiler 2x2400w elements with voltage controller

Re: Forced to build new Controller

Postby 1 2many » Tue Dec 15, 2015 3:08 pm

:wtf: I think WtDist has his wires crossed . :teasing-tease: :))
1 2many
Lifetime Member
 
Posts: 4215
Joined: Sun Jan 27, 2013 6:08 am
Location: Where the sun shines
equipment: Portable A.G brewery ,#001 5 STAR blockhead 4" Modular 4 plate SSG with,6"inline thumper, 2.5" 9 tube shotgun, packed section, Boiler 50 ltr inverted keg 4"still mount, 2.4 Kw FSD elements 1"drain.

Re: Forced to build new Controller

Postby Shiftynev » Tue Dec 15, 2015 3:32 pm

Shiftynev wrote:Thanks WD,
That's the same one as I currently use. The diagram shows that power both live and neutral (I.e.from the power point) as going into the 2 terminals on the left of the controller and the lead to the element as going out from the 2 terminals on the left of the controller. If you placed the controller in the diagram flat on a table with the terminals facing you, it would be positioned the same as the one depicted in your response. So power in from the left and power out to the elements from the right.

Am I missing something or not reading the diagram correctly.

Cheers


Correction. Reference to the second "left" in the second sentence should in fact refer to "right", in other words the cable to the element is from the 2 terminals on the right of the SCR controller when facing you.

Apologies
Shiftynev
 
Posts: 101
Joined: Mon Aug 04, 2014 7:58 pm
Location: Melbourne
equipment: 5 plate, 4" glass bubbler, 600mm packed section, 2"Pot, 2" Boka, 50ltr Keg boiler 2x2400w elements with voltage controller

Re: Forced to build new Controller

Postby WTDist » Tue Dec 15, 2015 3:43 pm

1 2many wrote::wtf: I think WtDist has his wires crossed . :teasing-tease: :))

:laughing-rolling:
The 2 left ones are both load in and neutral in . The 2 right ones are both load out and neutral out.... left 2 are Input... Right 2 are output
diagram.jpg


the red ones 2nd from the right are going to element and voltmeter. the 2 black ones on the far right are going to the powerpoint. they are both outputs, no input

Worked for me and was tested before we powered it up
You do not have the required permissions to view the files attached to this post.
WTDist
 
Posts: 2
Joined: Sun Oct 05, 2014 11:32 am
Location: Brisbane
equipment: Building a 4" bubbler with 8" glass thumper

Re: Forced to build new Controller

Postby 1 2many » Tue Dec 15, 2015 7:26 pm

WTDist wrote:This is the wiring. left cable gland goes to the boiler, right to the wall.


Ah ok you must mean looking from outside the box. :O)

controller.jpg


Coz from the inside it would be wrong. :teasing-neener:
You do not have the required permissions to view the files attached to this post.
1 2many
Lifetime Member
 
Posts: 4215
Joined: Sun Jan 27, 2013 6:08 am
Location: Where the sun shines
equipment: Portable A.G brewery ,#001 5 STAR blockhead 4" Modular 4 plate SSG with,6"inline thumper, 2.5" 9 tube shotgun, packed section, Boiler 50 ltr inverted keg 4"still mount, 2.4 Kw FSD elements 1"drain.

Re: Forced to build new Controller

Postby WTDist » Tue Dec 15, 2015 7:46 pm

In pic left is boiler
Here it is working
2015-12-15 19.44.03.jpg
You do not have the required permissions to view the files attached to this post.
WTDist
 
Posts: 2
Joined: Sun Oct 05, 2014 11:32 am
Location: Brisbane
equipment: Building a 4" bubbler with 8" glass thumper

Re: Forced to build new Controller

Postby domgistimo » Tue Feb 02, 2016 7:04 pm

Hey I've got a scr for my 2400 w element and I want the same setup as you where did you get the voltmeter from and the fan
domgistimo
 
Posts: 39
Joined: Sat Nov 01, 2014 7:18 pm
equipment: Reflux

Re: Forced to build new Controller

Postby WTDist » Thu Feb 04, 2016 1:13 pm

domgistimo wrote:Hey I've got a scr for my 2400 w element and I want the same setup as you where did you get the voltmeter from and the fan

ebay, all links are on my build thread
WTDist
 
Posts: 2
Joined: Sun Oct 05, 2014 11:32 am
Location: Brisbane
equipment: Building a 4" bubbler with 8" glass thumper


Return to Electrical Hardware



Who is online

Users browsing this forum: No registered users and 49 guests

x