Hey Zak
Maybe weld a small piece of stainless inside the hole in the side.
Keeping it as low as possible - rather than looking like a patch.
Being a double skin it is a pain to do much else with it.
The hole in the bottom will have a tube attached on the inside.
inside keg before grinding a.JPG
Are you going with the 2" drain and 6" ferrule for the column?
It's going to be difficult to put a filler port into the top of the keg.
The legs on Woodduck's boiler are the go.. Look great and keep everything steady.
Keep us posted as no one else has done one of these yet.
:handgestures-thumbupleft:
DBV
You do not have the required permissions to view the files attached to this post.