I finally got most of the bits together to increase my boiler size to be able to do a run with 60L.
An 80L keg, some shiny bits from FSD, some gas for the new tig welder and some videos on how to tig weld.
I attacked with an angle grinder an tried to get a nearly straight line for the ferrule holes.
After trying for hours with drill bits and hole cutters :angry-banghead: I borrowed a plasma cutter from a mate - so much easier :smile:
I extended the ferrules for the elements to allow for the shape of the keg and the tigged all the ferrules inside and out.
Added some legs and closed up the hole in the front
Now just have to do the drain pipework & valve, wheels on the legs and a controller for the elements. Which will all have to wait until I get back in a couple of months.