If its not vertical the reflux would not flow through the packing right it would run down side of packed section rather than through media :handgestures-thumbupleft:
equipment: 2" pot with 2" shotty 400mm long 5x 1/2" on a t500 boiler. 50l keg boiler 4" still mount 4" sight glass 1" drain.. 4 plate 4" bubbler, 600mm packed section
equipment: 2" pot with 2" shotty 400mm long 5x 1/2" on a t500 boiler. 50l keg boiler 4" still mount 4" sight glass 1" drain.. 4 plate 4" bubbler, 600mm packed section