Buj wrote:Hey Dfer,
I'm currently rigging up a Pulley system to raise the rig, or parts of, off the boiler. Mainly for removing packed section. I've got a 2.7m roof and still having height issues :-B
great set up, although not much wriggle room at the top of the rig.
i have a similar pulley system, for support mainly.
when i pour an on-the-grain wash into a BIAB bag in the boiler, i use the pulley to hoist the BIAB and let it drain.
one thing, i use a very heavy steel fishing line leader instead of a chain.
it's goes through a silicone tube to minimise rubbing/chaffing on the still.