Re: Planning a build
Posted:
Tue Jan 13, 2015 7:58 pm
by CyBaThUg
K cheers no I meant two seperate 15 amp points but if it's enough on a ten and one on 15 should b sweet
Re: Planning a build
Posted:
Tue Jan 13, 2015 8:01 pm
by MacStill
CyBaThUg wrote:K cheers no I meant two seperate 15 amp points but if it's enough on a ten and one on 15 should b sweet
Yeah 6kw is plenty enough for anything your going to run on a 100 litre boiler, I'd go as far as saying it's perfect! :handgestures-thumbupleft:
Re: Planning a build
Posted:
Sun Feb 08, 2015 10:06 am
by phonetic
Reece Plumbing are ripoffs. $26 for 2 50mm copper pipe ends, cheap option is use 2 inch brass welch plugs & copper electroplate, 500 grams copper sulfate bag costs $5, welch plugs $3 each.
Will copper electroplate brass fittings to test concept.