I plan to use 4in pipe 100mm tall cut it down the middle to make it small enough to loosely fit inside and solder it with a copper bottom with heaps of small holes drilled.
As I have not yet made it I can't attest to it's function though
equipment: 18 gal keg boiler on its side on wheel's with fill port, 1in drain and 2x2.4kw elements 4in 5 plate modular blockhead with optional infusion basket
equipment: 18 gal keg boiler on its side on wheel's with fill port, 1in drain and 2x2.4kw elements 4in 5 plate modular blockhead with optional infusion basket