First VM build

Reflux still design and discussion

First VM build

Postby kiwispirit » Mon Aug 10, 2015 6:44 pm

Ok so as promised here is my build that I have done over the last few months. Its been a real learning curve but good fun also and now the fun begins driving it and getting some sweet as product.
You do not have the required permissions to view the files attached to this post.
kiwispirit
 
Posts: 23
Joined: Wed Feb 25, 2015 5:06 pm
Location: Brisbane
equipment: 2.5" VM still, 50lt keg with 3" sight glass on 3 ring burner, wheelie bin AC water re-circulating system, modular pot still attachment to the vm still

First VM build 2

Postby kiwispirit » Mon Aug 10, 2015 6:50 pm

second lot of pictures
You do not have the required permissions to view the files attached to this post.
kiwispirit
 
Posts: 23
Joined: Wed Feb 25, 2015 5:06 pm
Location: Brisbane
equipment: 2.5" VM still, 50lt keg with 3" sight glass on 3 ring burner, wheelie bin AC water re-circulating system, modular pot still attachment to the vm still

first vm build 3

Postby kiwispirit » Mon Aug 10, 2015 6:56 pm

3rd lot of pictures
You do not have the required permissions to view the files attached to this post.
kiwispirit
 
Posts: 23
Joined: Wed Feb 25, 2015 5:06 pm
Location: Brisbane
equipment: 2.5" VM still, 50lt keg with 3" sight glass on 3 ring burner, wheelie bin AC water re-circulating system, modular pot still attachment to the vm still

first VM build 3

Postby kiwispirit » Mon Aug 10, 2015 7:05 pm

last lot of pictures to complete the build
You do not have the required permissions to view the files attached to this post.
kiwispirit
 
Posts: 23
Joined: Wed Feb 25, 2015 5:06 pm
Location: Brisbane
equipment: 2.5" VM still, 50lt keg with 3" sight glass on 3 ring burner, wheelie bin AC water re-circulating system, modular pot still attachment to the vm still

Re: first VM build 3

Postby rumdidlydum » Mon Aug 10, 2015 7:10 pm

Haha the mods are going to have fun cleaning these posts up. :laughing-rolling:
Next time just post in the one topic instead of multiple topics :D
Nice job on the rig :handgestures-thumbupleft:

Easy mate ;-)
rumdidlydum
 
Posts: 2619
Joined: Sun Oct 27, 2013 7:20 pm
Location: CQ
equipment: The infamous Illuminated chicken leg boiler, Rum glass and other bits and bobs

Re: First VM build

Postby Zak Griffin » Mon Aug 10, 2015 8:52 pm

Very nice mate!
Zak Griffin
Lifetime Member
 
Posts: 6832
Joined: Mon Jul 15, 2013 9:34 pm
Location: Radelaide
equipment: "The Heart of Gold" - 4" Bubbler - finally bubbling!
"Zaphod" - 3" Pot - retired
"Agrajag" - 6" Bubbler - midlife crisis build?

Re: First VM build

Postby kiwispirit » Mon Aug 10, 2015 9:13 pm

yeah sorry bout the mess of the photos... just learning.... when I add an attachment it goes above the last picture you just added so you have to do them backwards order???. How do you comment then add a picture then more comments then another picture?? I can use photoshop ok but this is next level stuff :laughing-rolling:
kiwispirit
 
Posts: 23
Joined: Wed Feb 25, 2015 5:06 pm
Location: Brisbane
equipment: 2.5" VM still, 50lt keg with 3" sight glass on 3 ring burner, wheelie bin AC water re-circulating system, modular pot still attachment to the vm still

Re: First VM build

Postby Zak Griffin » Mon Aug 10, 2015 9:15 pm

Upload the pic, click 'place inline', and write your comments. Repeat :handgestures-thumbupleft:
Zak Griffin
Lifetime Member
 
Posts: 6832
Joined: Mon Jul 15, 2013 9:34 pm
Location: Radelaide
equipment: "The Heart of Gold" - 4" Bubbler - finally bubbling!
"Zaphod" - 3" Pot - retired
"Agrajag" - 6" Bubbler - midlife crisis build?

Re: First VM build

Postby WTDist » Mon Aug 10, 2015 10:06 pm

Hit preview also, you will see then.
Anyway nice job :handgestures-thumbupleft:
WTDist
 
Posts: 2
Joined: Sun Oct 05, 2014 11:32 am
Location: Brisbane
equipment: Building a 4" bubbler with 8" glass thumper


Return to Reflux Stills



Who is online

Users browsing this forum: No registered users and 62 guests

x